By service

Ceramic coating shop software for every stage of the job.

A customer buys a bottle and a name. What they really pay for is a day of correction they never see. ShopHawk times each step as its own task.

One ceramic job, hour by hour
Each service on the work order is its own task, with its own timer.
08:00

 

Task
WO-000148
Wash and dry
1 hr
1 hr
Decontaminationiron and tar
1.5 hrs
1.5 hrs
Paint correctionthe real work
4 hrs
4 hrs
Refining polishsecond pass
1.5 hrs
1.5 hrs
Ceramic coatingQC failed: Contamination
1 hr + Rework
1 hrRework
80% prep and correction20% coating and reworkA rework restarts the same task’s timer

Price the coating alone and you lose money. Price the whole day and you do not. When each service is its own task with a timer, the real hours are on record, and the learned ETA for the next ceramic job comes from them, not from a guess.

Pick a topic

Usage

Every mL, car part by car part.

Log the coating on each area of the job, with the waste beside it. The waste comes off the bottle too.

Inventory Usage · Prologue
Ceramic Coating, in mL
Selected AreaUsage and wasteUsageWaste
Hood3 mL0.5 mL
Roof2.5 mL0.5 mL
Doors5 mL1 mL
Front Bumper2 mL0.5 mL
This job12.5 mL2.5 mL
Roll ID C-2207 · 50 mL bottleRemaining: 5 mL
Your plan: 12.5 mL a car, so 4 carsWith waste: 15 mL a car, so 3 cars
UsageWasteYour plan, one car

Waste empties the bottle too. Plan 12.5 mL a car and a 50 mL bottle does four cars. Add 2.5 mL of waste a car and it does three. At Job Done, ShopHawk takes the usage and the waste off the bottle, so Remaining shows what is really left.

The cure

Finished at six, gone at eleven the next day.

Coating needs time to cure. The tech is done long before the car is ready, and that gap is where the keys go back too early.

WO-000148, one ceramic job
A 24 hour clock. The outer arc is hands on work. The inner amber arc is the cure.
08:00
0.0 hrsof hands on work so far
08:0018:0011:00 next day

Running the clock forward. Grab the handle to take over.

The day

Task timers, Start to Complete10 hrs
Work order, Ready for Delivery18:00
Vehicle Curing, not timeduntil 11:00

What that costs

A car that looks done at six is not ready at six. Hand the keys back that evening and the owner drives a soft coating into the rain, which is how a five year warranty turns into a callback.

So the front desk knows

The work order says Ready for Delivery at six. The Vehicle Curing event status on the appointment says wait. Set it by hand when the coat goes on.

Book a demo →

See your own coating jobs, task times and usage in a 20 minute walkthrough.

See it on your own jobs. 20 minute walkthrough, no slides.

Book a demo →

Book a demo

Twenty minutes on your own jobs.

We load a week of your real work orders before the call, so you are looking at your shop rather than a sample account.

  • 1Before the callSend one export, or nothing at all. Either works.
  • 2On the callYour board, your invoices, your warranty book.
  • 3AfterYou keep the workspace whether you buy or not.
  1. 1Pick a time
  2. 2Your details
  3. 3Confirmed

Pick a day

Pick a time, your local time

Pick a day, then a time

What the twenty minutes look like

0 – 5Your board, with your own jobs on it
5 – 11Invoices, payments and what a month actually kept
11 – 17Warranties, claims and who carries the fault
17 – 20Your questions, and what moving over looks like